BUILDING INFORMATION MANAGEMENT
Our integrated project delivery model with AIA guidelines enable to integrate engineers with Detailers in very early stage of the project. This optimizes the project results through reducing RFI cycle time and better co-ordination between all phases of Design, Fabrication, and Construction.
​
Deliverables:
​
Structural model of BIM co-ordination
Preliminary material take-off
Virtual construction model

Sublime Structures

Sublime Structures

Sublime Structures

Sublime Structures
1/24
Material Take-off
A detailed report which includes total tonnage, member sizes, member lengths and much more
Estimation